stuart:pease

GRP laminate design and engineering


Stormforce 10 refurbishments

From start to finish, we manage the whole project

A number of log-boats from the ‘Stormforce 10’ ride at Drayton Manor needed refurbishment, as due to their age the bottom of the boats were beginning to lose their non-slip surface, and hence were struggling to travel-up the conveyor.

New patterns and GRP moulds were manufactured, the existing bottoms were removed and replaced with new, and various other components were also replaced at the same time. The customer was delighted with the outcome.

View All Projects
.